Project Controls International

FPSO and Topsides

West African Costs

Basis of Estimate

(procedures)
(analyses)
(white papers)

 

         Project Knowledge = Success

                    

www.projectcontrolsinternational.com

Que$tor Estimates

(white papers)

www.projectcontrolsinternational.com    |   contact: jorge.alberch@gmail.com   |   check me out at

Home

 

Analysis

- Construction Unit Costs

- FPSO and Topside Costs

- Offshore Fabrication Costs

- Welding Consumables

 

B.Dev./ Contracts

- Contracts: Quantum Meruit

- Guide to Business Acquisition

- Proposal Development

- Relationship Building

- Video: LATTE (Starbucks)

Mind Maps

- Estimating

- Planning

- Schedule Development

- Schedule Maintenance

- Risk Management

 

Procedures

- Constructability

- Document Management

- Estimating Process

- Project Claims and COs

- Project Controls

- Project Execution Plan

- Project Execution Strategy

- Contract Synopsis

Scheduling

- Basis of Schedule

- Number of Schedule Activities

- MS Project vs. Primavera P6

- Planning and Scheduling

- Schedule Extension of  Time

- Typical Primavera P6 Settings

- Updating a P6 Schedule

- Video: Liquidated Damages

- Why Your Project will be Late

 

Courses

- Construction Estimating

- Estimating Course

- Planning and Scheduling

White Papers

- Basis of Estimate

- Communicating Effectively

- Construction Escalation

- Earned Value Management

- Estimating Productivity

- Evaluating Change Orders

- International Multipliers

- Nigerian Content Development

- Project Execution Plan

- Project Risk Contingency

- Project Variables

- Que$tor Estimates

- Risk Analysis Spreadsheet

- Risk Breakdown Structure

- Risk Management

- Spreadsheets vs Databases

- Starting the Project

- Why Project Controls

- Work Breakdown Structure

Interesting Stuff

- Programmable Robot

- Pipe Dimensions and Weights

- Concurrent Database

- LibreOffice Base vs. MS Access

- SharePoint Database

- SAP vs Oracle ERP

- Free Unit Converter

- Motivational Food for Thought

- Passionate about Meetings?

- Video: Project Controls

 

 

Contact Us

- Bio

- PMC Consultancy

Building Construction Costs

Building Unit Construction Costs

 

A selected list of unit costs taken from the DOD facilities pricing guide 2011. This covers various building and facility costs as per below.

 

- These costs are exclusive of land costs, demolition of existing brownfield facilities, clearing, grading and landscaping and other property improvements.

- For normalization of costs please refer to: Construction and Fabrication Escalation

 

Note: for the full complete listing of facilities construction unit costs see attachment here.

Item

UOM

Unit Cost (USD)

Fixed-Wing Runway, Surfaced

SY

168.95

Air Control Tower

SF

841.23

Aircraft Shelter

SF

136.48

Organizational Classroom

SF

150.79

Ship Maintenance Dry-dock

SF

646.05

Hospital

SF

444.65

Medical Laboratory

SF

238.76

General Administrative Building

SF

216.52

Family Housing Dwelling

SF

118.36

Student Barracks

SF

151.76

Dining Facility

SF

314.4

Police Station

SF

248.42

Laundry/ Dry Cleaning Facility

SF

160.13

Education Center

SF

211.69

Library, General Use

SF

232.96

Recreation Center

SF

229.09

Indoor Physical Fitness Facility

SF

200.09

Indoor Swimming Pool

SF

201.06

Auditorium and Theater Facility

SF

165.92

Pavilion

SF

57.18

Stand-By/ Emergency Power

KW

268.29

Electrical Power Source, Hydroelectric

MW

2382667

Electrical Power Source, Wind

KW

2171

Electrical Power Line, Overhead

LF

24.52

Electrical Power Line, Underground

LF

29.97

Electrical Power Substation

KV

200.18

Electrical Power Switching Station

KV

10.71

Electrical Power Transformers

KV

34.41

Sewage Treatment

KG

5975.42

Sewer and Industrial Waste Line

LF

53.20

Water Treatment Facility

KG

2210.09

Water Storage, Potable

GA

2.90

Desalinization Plant

KG

7509.28

Water Distribution Line, Potable

LF

25.4

Road, Surfaced

SY

26.13

Road, Unsurfaced

SY

11.02

Vehicle Bridge

SY

1,066

Vehicle Parking, Surfaced

SY

30.61

Sidewalk and Walkway

SY

35.62

Boundary Fence and Wall

LF

33.25

Security Fence

LF

69.73